info@paklifts.com
Customer Support : +92-334-5399970 (9:00 AM - 6:00 PM)

Platform Lift

Sales & Installation of Wheelchair Platform Lift:

wheelchair lift

wheelchair lift

Delivery Time:
• Fair Delivery time 8-10 weeks
• Installation 2 days
• Testing and handing over 1 day

Max. Platform Height:
5400mm / 19 feet Aprox. Or as per actual
Load Capacity: 500 KG
Available size 1425*860
Min Platform height 600mm
Speed 0.10~0.30m/s
Control voltage 24V/DC
Voltage As per your local Standard (single phase or three phase)
Control Mode Automatic travel switch
Drive Control Self-resetting system
Overload Over current relay protection
Cabin Frame: stainless steel, four sides Aluminum alloy.
Materials Aluminum rails and guard with spraying plastics.
Working Condition Both indoors and outdoors -20°~70°C
Entrance-Exit Way Front entry right exit
Installation No pit installing, easy to install and remove
<3.0m, installed directly on the floor. >3.0m, installed both on the floor and on the wall.

Switches

A. One control panel on the platform
B. Install two column switches on ground, which can be fixed at any floor needed.
C. Remote control, user can operate lift within 20m.

Professional Safety Precautions

1. Safety Sensor Safety sensor below the car. It will stop at once touching obstacles while decline. (See details below)
2. Safety Interlock Lock the platform automatically when it is out of control
3. Emergency Descent Manual down in emergency when it can’t low down because of power off or other reason (See details below)
4. Aluminum Rails Strong and durable aluminum extruded section (See details below)
5. Over Load Protection over current relay control, Pressure relief valve prevent overload operation
6. Noise Up to American standard ANSI/ASME and Europe standard EN1570

Buyers Obligations:
• Civil work related to wheel chair lift installation such as platform extension and missionary work will be done by buyer
• Availability of a single phase/three-phase electric supply (with good earth) at ground floor near to project place.
• One power supply connection for erection works.
• Storage space for the material on site. Safety/protection of equipment from theft, damage, dust, dirt, water etc. is to be ensured by the buyer.
• Scaffolding provision and erecting is buyer’s responsibility.